Projects
- Renewable Energy Project - Vermont National Guard 2.2MW Solar Project
- AllSun Solar Tracker Installations
- East Alburgh Bridge Swing Span Automation
- Renewable Energy Project - Rock of Ages 100kW Wind Turbine
- Lime Kiln Substation Retaining Wall
- North Hero-Grand Isle Draw Bridge Emergency Superstructure Repairs
- City of Burlington Municipal Paving Contract
- Interstate 91 Rutfill Project
- Pinkham Notch Conduit System
- Grade Crossing at Rte 142 Vernon
- Bellows Falls Tunnel Clearance Improvements
- Burlington Tunnel Emergency Repairs
- VELCO 115kV Underground Electric Transmission Line
- VELCO & GMP Lime Kiln Substations
- VTrans Intelligent Information System (ITS)
- Vermont State Archive Fire Water Storage System
AllSun Solar Tracker Installations
ECI has been working with All Earth Renewables of Williston, Vermont to install their All Sun solar trackers since July 2010. These solar panel systems track the sun and align themselves to optimize the harvesting of solar energy. ECI’s scope of work generally consists of installation of the tracker foundation (either a screw-in galvanized steel post or a precast concrete footing), installation of conduit/wire, and incidental site work.
ECI has installed nearly 1,000 of these units throughout northern Vermont, including 385 at All Earth Renewables’ solar farm in South Burlington, Vermont. However, most of the installations have been on a smaller scale (1 to 12 trackers) for residential, municipal, institutional, and commercial sites.
Check out the trackers and their performance on All Earth Renewables’ website: All Sun Tracker