|
|

Installing Concrete Grade Crossing on the VTR

Ballast Regulator

Tamping with our Mark III on the GMRR mainline

Track Repair on NECR

Installing Rail Seal at the NECR at Maple St, Essex Jct, VT

ECI's JD210 Hi Rail Excavator

Repairing Track after Derailment

Embankment Stabilization

Bethel Bridge Repair

Installing continuous welded rail - Brattleboro, VT

Trackwork - Bellows Falls Tunnel, VT

Amtrak Passing Through Bellows Falls Tunnel, VT

Shop Fabrication for VTR Bridge Slabs

Charlotte Station Vermont Railway
|
ECI has completed
numerous railroad projects including:
- Grade Crossing
Improvements - Burlington to Charlotte, Vermont; various crossings
on the NECR; CSO; Mass Central; and VTR
- Embankment, retaining wall and culvert repairs
- Bridge repairs: timber replacement; abutment repairs; girder replacement
- Numerous cased bores below active tracks
- Installation of signal wires by directional drilling and rail plowing
- Crossing Signal Construction
- Tunnel Improvements
- Turntable Repairs
- Track work including: installation of switches and track
- Railroad flagman for various projects
- Consulting (geotechnical, structural, track) and design-build projects
- Emergency repsonse to derailments, culvert failures, bridge damage, etc.
- Track Removal & Salvage
Personnel:
ECI Rail Constructors is headed by Eugene Trombly, former roadmaster of New England
Central Railroad. Mr. Trombly's extensive knowledge and experience in
track work and maintence provide ECI with the ability to tackle a variety
of railroad projects.
Ken and Alan Pidgeon
are our on-staff registered professional engineers. Their expertise
in geotechnical, structural, railroad and construction engineering provide
us with a unique consulting and design-build capability.
Equipment:
ECI has several
pieces of specialty equipment for railroad use, including:
- Hi-Rail Rotary Dump Truck
- Hi-Rail Log Truck
- Rail Heater
- John Deere 210 Excavator on Hi-Rail trucks
- Rail Plow for installing cable or conduit
- Hi-Rail Pick-up trucks
- Fairmont Tamper Ballast Regulator - C154BR with snow plow
- Fairmont Tamper Mark III Switch Tamper
- Specialty tools including rail saws, drills, and tamps
|

JD595 Hi-Rail Excavator

Rail Plowing in Middlebury, VT

Hi-Rail Rotary Dump Truck

Bridge Abutment Replacement GMRR Bridge 107
Rockingham, VT

Emergency stock - railroad materials

Turntable Rehab - St. Albans, VT
Fabrication in ECI's shop

Washoot Repair
Drummerston, VT

Bridge Slab Replacement, Vermont Railway

ECI's Hi-Rail Log Truck during the Lamoille Valley Railroad Take-up

Bellows Falls Tunnel
Track Lowering Project

Burlington Tunnel Repair
|
|