
Blog
- News
- The Rail Plow Story
- Fleet
- History
- Company Structure
- Corporate Leadership
- Ben Dow – Chief Executive Officer / President
- Jim McNall – Vice President – Paving
- Ben MacKinney – Vice President – Heavy Civil and Rail
- Mark Peloquin – Senior Project Manager
- Ben Heath – Vice President – Civil
- Ron Johnston – Concrete Market Manager
- Tom Loyer – Vice President – Trenchless Technologies
- Philosophy
ECI is Recognized at Solar Farm Ceremony
The Vermont National Guard Renewable Energy Project was unveiled in a ceremony at the South Burlington Air Base on Saturday October 1. The event was attended by VIP Guests Senator Bernie Sanders, Adjunct General Michael Dubie, Base Commander Douglas Fick, and Ken Pidgeon of Engineers Construction, Inc.

Left to Right: Adjunct General Michael Dubie, Senator Bernie Sanders, Wing Commander Douglas Fick, and Ken Pidgeon of ECI
The project involved a design/build solar farm that currently generates 1.6 mega watts (MW) of electricity with a future capacity of 2.2 MW. More details and photos of the project are included in the following link:
The ceremony was also attended by various local media: