
Projects
- Ryegate Culvert Design-Build Replacement Project
- Franklin County State Airport Expansion – 2024
- New Haven – Ferrisburg Trenchless Culvert Project
- Pittsford Rail Bridge Rehab & Strengthening
- Renewable Energy Project – Vermont National Guard 2.2MW Solar Project
- AllSun Solar Tracker Installations
- East Alburgh Bridge Swing Span Automation
- Whipline Gas Bore
- Gentes Road Bridge Rehabilitation
- Hartford Bridge Street Bridge Replacement
- CCTA Downtown Transit Center
- Renewable Energy Project – Rock of Ages 100kW Wind Turbine
- Lime Kiln Substation Retaining Wall
- North Hero-Grand Isle Draw Bridge Emergency Superstructure Repairs
- City of Burlington Municipal Paving Contract
- Interstate 91 Rutfill Project
- Pinkham Notch Conduit System
- Grade Crossing at Rte 142 Vernon
- Bellows Falls Tunnel Clearance Improvements
- Burlington Tunnel Emergency Repairs
- VELCO 115kV Underground Electric Transmission Line
- VELCO & GMP Lime Kiln Substations
- VTrans Intelligent Information System (ITS)
- Vermont State Archive Fire Water Storage System
Print This Page
City of Burlington Municipal Paving Contract
ECI’s Client: City of Burlington, Vermont
Subcontractors: Scotts Line Striping
AC Paving Corporation has been awarded this municipal paving project multiple times in the past 10 years. We are uniquely qualified to perform this work thanks to our skilled workers and specialized paving equipment. Municipal paving is different from other paving projects because of the traffic control, managing of pedestrian traffic, coordination with businesses and residents, restricted access to narrow streets, overhead utilities that restrict direct dumping into the paver, significant quantities of in-road structures, and careful planning to best fit the new pavement surface to existing curbing, driveways, etc.
Scope of Work:
- Cold planing of existing surfaces or complete reclaiming
- Raising of any structures (manholes, catchbasins, valve boxes, etc) to accommodate new paving
- Maintenance of traffic
- Installation of bituminous asphalt pavements
- Associated curbing or sidewalk reconstruction
- Pavement markings
- Reconstruction of signal loop detection systems embedded in the pavements