Projects
- Hartford Bridge Street Bridge Replacement
- Renewable Energy Project – Vermont National Guard 2.2MW Solar Project
- AllSun Solar Tracker Installations
- East Alburgh Bridge Swing Span Automation
- Whipline Gas Bore
- Gentes Road Bridge Rehabilitation
- CCTA Downtown Transit Center
- Ryegate Culvert Design-Build Replacement Project
- Pittsford Rail Bridge Rehab & Strengthening
- New Haven – Ferrisburg Trenchless Culvert Project
- Renewable Energy Project – Rock of Ages 100kW Wind Turbine
- Lime Kiln Substation Retaining Wall
- North Hero-Grand Isle Draw Bridge Emergency Superstructure Repairs
- City of Burlington Municipal Paving Contract
- Interstate 91 Rutfill Project
- Pinkham Notch Conduit System
- Grade Crossing at Rte 142 Vernon
- Bellows Falls Tunnel Clearance Improvements
- Burlington Tunnel Emergency Repairs
- VELCO 115kV Underground Electric Transmission Line
- VELCO & GMP Lime Kiln Substations
- VTrans Intelligent Information System (ITS)
- Vermont State Archive Fire Water Storage System
Print This Page
Interstate 91 Rutfill Project
ECI’s Client: Vermont Agency of Transportation
Completion Date: Summer 2006
Subcontractors: L&D Safety Marking, LTD
AC Paving Corporation was the low bidder for the Rutfill Project on I-91 in 2006. The Rutfill projects involve cold planing and repaving of segments of the interstate that have been most severely rutted by truck wheels. Rutfill is a relatively simple and cost effective repair for this common problem along many of the interstate highways.
Scope of Work:
- 89,000 sy of cold planing of existing travel lanes
- Maintenance of traffic
- Installation of 6,200 tons of bituminous asphalt pavement
- Pavement markings