top of page
Renewable Energy Project – Rock of Ages 100kW Wind Turbine
ECI Client: Northern Power Systems
Subcontractors: Northern Realm Power, LLC
ECI was the general contractor on this 100 kW Northern Power Systems turbine installed at the summit of Millstone Hill in Graniteville, Vermont. The project is the showcase turbine for Northern Power Systems of Barre, Vermont, the manufacturer of the turbine. ECI’s scope of work included the sitework, foundation construction, erection of the tower (subcontractor), and installation of the turbine (ECI, subcontractor, and Northern Power).
ECI is also a certified Northwind 100 turbine installer.
bottom of page











_JPG.jpg)