VTrans Intelligent Information System (ITS)
ECI’s Client: Vermont Agency of Transportation
Completion Date: 2007
Subcontractors: Teljet Longhaul (Fiber Splicer/Tester)
This project consisted of a communications line upgrade to allow for relocation of some of the state’s computer network system that was vulnerable to flooding conditions along the Winooski River in Montpelier, Vermont. The project was highly visible on the main through street of Vermont’s capital city. A great many of Vermont state government employees passed by, and several visited the site daily. As a result, our work was under the watchful eye of not only the client, but other arms of state government responsible for OSHA compliance, environmental protection, stormwater discharge, etc.
ECI’s scope of work:
Rock trenching with our Tesmec 900 down a 1H:3V slope.
Directional Drilling 750 ft in rock below the Winooski River and Memorial Dr
Install 4-in-dia HDPE Casing Pipe & Three 1.25-in-id innerducts
Installation of fiber optic cable including splicing, terminations, and testing