Projects
- Renewable Energy Project - Vermont National Guard 2.2MW Solar Project
- AllSun Solar Tracker Installations
- East Alburgh Bridge Swing Span Automation
- Renewable Energy Project - Rock of Ages 100kW Wind Turbine
- Lime Kiln Substation Retaining Wall
- North Hero-Grand Isle Draw Bridge Emergency Superstructure Repairs
- City of Burlington Municipal Paving Contract
- Interstate 91 Rutfill Project
- Pinkham Notch Conduit System
- Grade Crossing at Rte 142 Vernon
- Bellows Falls Tunnel Clearance Improvements
- Burlington Tunnel Emergency Repairs
- VELCO 115kV Underground Electric Transmission Line
- VELCO & GMP Lime Kiln Substations
- VTrans Intelligent Information System (ITS)
- Vermont State Archive Fire Water Storage System
Print This Page
Pinkham Notch Conduit System
ECI’s Client: FairPoint Communications
Completion Date: Fall 2008
Subcontractors: No Construction Subcontractors; Completely Self-Performed
Consultants: Permitting and Surveying
ECI designed and constructed this 10-mile-long run of underground conduit through Pinkham Notch, NH. The Notch is a popular tourist destination in the heart of the White Mountain National Forest at the base of Mt. Washington. It is considered the most sacred roadway in New Hampshire.
FairPoint required this connection to complete a critical ring for its communications backbone. ECI was selected because of our similar design/build experience in the nearby Kinsman Notch in 2002.
ECI’s scope of work included the following:
- Survey/Engineering/Permitting
- Sediment Control and Erosion Prevention
- Directional Drilling for Stream and Road Crossings
- Bridge Attachment Installation
- Underground Conduit and Handhold Construction
- Traffic Control/Site Restoration/Etc.