Projects
- Hartford Bridge Street Bridge Replacement
- Renewable Energy Project – Vermont National Guard 2.2MW Solar Project
- AllSun Solar Tracker Installations
- East Alburgh Bridge Swing Span Automation
- Whipline Gas Bore
- Gentes Road Bridge Rehabilitation
- CCTA Downtown Transit Center
- Ryegate Culvert Design-Build Replacement Project
- Pittsford Rail Bridge Rehab & Strengthening
- New Haven – Ferrisburg Trenchless Culvert Project
- Franklin County State Airport Expansion – 2024
- Renewable Energy Project – Rock of Ages 100kW Wind Turbine
- Lime Kiln Substation Retaining Wall
- North Hero-Grand Isle Draw Bridge Emergency Superstructure Repairs
- City of Burlington Municipal Paving Contract
- Interstate 91 Rutfill Project
- Pinkham Notch Conduit System
- Grade Crossing at Rte 142 Vernon
- Bellows Falls Tunnel Clearance Improvements
- Burlington Tunnel Emergency Repairs
- VELCO 115kV Underground Electric Transmission Line
- VELCO & GMP Lime Kiln Substations
- VTrans Intelligent Information System (ITS)
- Vermont State Archive Fire Water Storage System
Print This Page
Gentes Road Bridge Rehabilitation
The bridge was constructed circa 1910 to separate the roadway from the crossing with the Central Vermont Railroad. The superstructure was replaced with concrete beams in 1991. However, the original concrete abutment, backwall, and wingwalls were in need of rehabilitation. ECI was contracted with the Town of Essex Junction to reface the abutments and wingwalls, and replace the backwalls. The project also included a new asphalt pavement deck and waterproofing membrane.
ECI scaled the deteriorated faces of abutments and wingwalls with an excavator-mounted grinder. Nearly 1,000 stainless steel dowels were used to connect the old structures with the new 8-inch-thick concrete face.