Projects
- Hartford Bridge Street Bridge Replacement
- Renewable Energy Project – Vermont National Guard 2.2MW Solar Project
- AllSun Solar Tracker Installations
- East Alburgh Bridge Swing Span Automation
- Whipline Gas Bore
- Gentes Road Bridge Rehabilitation
- CCTA Downtown Transit Center
- Ryegate Culvert Design-Build Replacement Project
- Pittsford Rail Bridge Rehab & Strengthening
- New Haven – Ferrisburg Trenchless Culvert Project
- Renewable Energy Project – Rock of Ages 100kW Wind Turbine
- Lime Kiln Substation Retaining Wall
- North Hero-Grand Isle Draw Bridge Emergency Superstructure Repairs
- City of Burlington Municipal Paving Contract
- Interstate 91 Rutfill Project
- Pinkham Notch Conduit System
- Grade Crossing at Rte 142 Vernon
- Bellows Falls Tunnel Clearance Improvements
- Burlington Tunnel Emergency Repairs
- VELCO 115kV Underground Electric Transmission Line
- VELCO & GMP Lime Kiln Substations
- VTrans Intelligent Information System (ITS)
- Vermont State Archive Fire Water Storage System
Print This Page
Renewable Energy Project – Rock of Ages 100kW Wind Turbine
ECI Client: Northern Power Systems
Subcontractors: Northern Realm Power, LLC
ECI was the general contractor on this 100 kW Northern Power Systems turbine installed at the summit of Millstone Hill in Graniteville, Vermont. The project is the showcase turbine for Northern Power Systems of Barre, Vermont, the manufacturer of the turbine. ECI’s scope of work included the sitework, foundation construction, erection of the tower (subcontractor), and installation of the turbine (ECI, subcontractor, and Northern Power).
ECI is also a certified Northwind 100 turbine installer.